Hierarchical Risk Communication Management Framework for Construction Projects
Journal article
Mansour, M., Beithou, N., Alsqour, M., Tarawneh, S.A., Al Rababa’a, K., AlSaqoor, S. and Chodakowska, E. (2023). Hierarchical Risk Communication Management Framework for Construction Projects. Engineering Management in Production and Services. 15 (4), pp. 104 - 115. https://doi.org/10.2478/emj-2023-0031
Authors | Mansour, M., Beithou, N., Alsqour, M., Tarawneh, S.A., Al Rababa’a, K., AlSaqoor, S. and Chodakowska, E. |
---|---|
Abstract | Risk, as an effect of uncertainty, is associated with every human activity. Like any other industry, construction companies are eager to reduce the uncertainty of reluctant events. A well-planned risk communication system could contribute to the success of a construction project. A proper announcement protocol could be a mitigating lever for identified or unidentified risks during planning and monitoring processes. This research aims to present a risk communication management system (RCMS) for construction companies involved in large projects. The proposed model includes a step-by-step communication procedure considering the authority level within the organisational hierarchical structure. The model aims to remove the ambiguity of risk communications during the construction process under uncertain conditions. It leaves no or little room for the emergence of unplanned risks. The proposed communication structure has been implemented in GRC cladding construction projects, and the risk communication time and response have been significantly improved. |
Year | 2023 |
Journal | Engineering Management in Production and Services |
Journal citation | 15 (4), pp. 104 - 115 |
Publisher | De Gruyter |
ISSN | 2300-0813 |
Digital Object Identifier (DOI) | https://doi.org/10.2478/emj-2023-0031 |
Web address (URL) | https://doi.org/10.2478/emj-2023-0031 |
Publication dates | |
Online | 01 Dec 2023 |
Publication process dates | |
Accepted | 15 Nov 2023 |
Deposited | 08 Feb 2024 |
Publisher's version | License File Access Level Open |
https://openresearch.lsbu.ac.uk/item/9652y
Download files
Publisher's version
Hierarchical-Risk-Communication-Management-Framework-for-Construction-Projects.pdf | ||
License: CC BY-NC-ND 4.0 | ||
File access level: Open |
41
total views50
total downloads1
views this month3
downloads this month