Overcoming the limitations of the green pyramid rating system in the Egyptian construction industry: a critical analysis
Journal article
Daoud, A O, Othman, A A E, Ebohon, O J and Bayyati, A (2020). Overcoming the limitations of the green pyramid rating system in the Egyptian construction industry: a critical analysis. Architectural Engineering and Design Management. https://doi.org/10.1080/17452007.2020.1802218
Authors | Daoud, A O, Othman, A A E, Ebohon, O J and Bayyati, A |
---|---|
Abstract | Despite the tangible contributions of the construction industry to social development and economic growth, it is known for its natural resources overconsumption and solid waste (SW) generation both of which have major negative impacts on the natural environment. In the particular case of materials waste, the construction industry worldwide accounts for about 50% of global annual generated SW. In addition, construction materials may contribute up to 50% of the total project cost. Accordingly, the negative implications of the construction industry have compelled many nations to develop green building rating systems in order to preserve the environment, promote the economic efficiency of using resources, and enhance the quality of citizens’ lives which are necessary aspects for achieving the triple bottom line (TBL) of sustainability. |
Keywords | Sustainability; Green building rating syatems; GPRS; LEED; BREEAM |
Year | 2020 |
Journal | Architectural Engineering and Design Management |
Publisher | Taylor & Francis |
ISSN | 1745-2007 |
Digital Object Identifier (DOI) | https://doi.org/10.1080/17452007.2020.1802218 |
Publication dates | |
Online | 05 Aug 2020 |
Publication process dates | |
Accepted | 24 Jul 2020 |
Deposited | 25 Aug 2020 |
Accepted author manuscript | License File Access Level Open |
Supplemental file | License File Access Level Open |
Supplemental file | License File Access Level Open |
Supplemental file | License File Access Level Open |
Additional information | This is an Accepted Manuscript of an article published by Taylor & Francis in Architectural Engineering and Design Management on 05 Aug 2020, available online: http://www.tandfonline.com/10.1080/17452007.2020.1802218 |
Page range | 1-14 |
File | License File Access Level Open |
https://openresearch.lsbu.ac.uk/item/8q4z6
Download files
Accepted author manuscript
Final Draft of Manuscript_ AEDM-2020-0055.docx | ||
License: CC BY 4.0 | ||
File access level: Open |
Supplemental file
Tables_ AEDM-2020-0055.docx | ||
License: CC BY | ||
File access level: Open |
Figures_ AEDM-2020-0055.docx | ||
License: CC BY 4.0 | ||
File access level: Open |
Tables_ AEDM-2020-0055.docx | ||
License: CC BY 4.0 | ||
File access level: Open |
173
total views287
total downloads4
views this month12
downloads this month