Study of the Relationship between Procurement Duration and Project Performance in Design-Build Projects: Comparison between Water/Wastewater and Transportation Sectors
Journal article
Bogus, S, Migliaccio, G and Jin, R (2013). Study of the Relationship between Procurement Duration and Project Performance in Design-Build Projects: Comparison between Water/Wastewater and Transportation Sectors. Journal of Management in Engineering. 29 (4), pp. 382-391. https://doi.org/10.1061/(asce)me.1943-5479.0000165
Authors | Bogus, S, Migliaccio, G and Jin, R |
---|---|
Abstract | This material may be downloaded for personal use only. Any other use requires prior permission of the American Society of Civil Engineers. This material may be found at https://ascelibrary.org/doi/abs/10.1061/%28ASCE%29ME.1943-5479.00001... Previous studies on building, industrial, and transportation projects found that projects delivered using design-build tend to perform better than projects delivered with the traditional design-bid-build method. However, performance of design-build projects is affected by various factors, with procurement-related factors being among the most influential. |
Year | 2013 |
Journal | Journal of Management in Engineering |
Journal citation | 29 (4), pp. 382-391 |
Publisher | American Society of Civil Engineers (ASCE) |
ISSN | 0742-597X |
Digital Object Identifier (DOI) | https://doi.org/10.1061/(asce)me.1943-5479.0000165 |
Publication dates | |
Oct 2013 | |
Online | 07 Jan 2013 |
Publication process dates | |
Accepted | 04 Jan 2013 |
Deposited | 04 Jun 2020 |
Accepted author manuscript | File Access Level Open |
Permalink -
https://openresearch.lsbu.ac.uk/item/89y74
Download files
137
total views256
total downloads2
views this month2
downloads this month