Value Co-creation through Early Warning Signs in a Project Setting

Conference paper


Hajikazemi, S., Razmdoost, K and Smyth, H (2017). Value Co-creation through Early Warning Signs in a Project Setting. European Academy of Management (EURAM). Glasgow, Scotland 21 - 24 Jun 2017
AuthorsHajikazemi, S., Razmdoost, K and Smyth, H
TypeConference paper
Abstract

Value co-creation as a joint process between actors to extract benefits is becoming established as one the most significant shifts in contemporary business thinking. Value co-creation provides an opportunity for a balanced and enriched realisation of value amongst stakeholders such as clients, contractors and end users in complex projects. The success of complex projects, due to the large number of stakeholders and high uncertainty level, is highly dependent on the joint processes among clients and suppliers as the key creators of value. In particular, the management of communication, associated learning and conflict management are the main determinants of value co-creation. Although research studies have been conducted extensively to investigate ways to enhance performance of projects, little emphasis has been put on the importance of the value co-creation process for realising project benefits and impact. There has been scant attention paid to weak signals in theory and practice to defend value creation and encourage the conditions for co-creation early in the project lifecycle. Based on the theory of "weak signals", challenging situations and discontinuities do not emerge without warning. With hindsight, the most likely factors leading to undesired events are often signalled. The identification, evaluation and utilisation of these signals potentially improve learning and communication in the value co-creation process. This research aims to conceptually define weak signals of potential challenges in value co-creation processes, address the way they are identified and evaluated, and examine their use in improving value co-creation. In particular, we look at the processes jointly owned by contractors and clients in complex projects.

KeywordsValue co-creation; Early warning sign
Year2017
Accepted author manuscript
License
File Access Level
Open
Publication dates
Print21 Jun 2017
Publication process dates
Deposited06 Mar 2019
Accepted20 Mar 2017
Permalink -

https://openresearch.lsbu.ac.uk/item/86yz1

Download files


Accepted author manuscript
Hajikazemi- Razmdoost and Smyth _ EURAM.docx
License: CC BY 4.0
File access level: Open

  • 240
    total views
  • 148
    total downloads
  • 1
    views this month
  • 1
    downloads this month

Export as

Related outputs

To be or not to be: why do transaction partners in construction industry avoid formulating agreements into contract documents?
Chen, Y., Wu, Y., Hajikazemi, S., Yao, H. and Ebohon, O. (2022). To be or not to be: why do transaction partners in construction industry avoid formulating agreements into contract documents? CIB WBC 2022. RMIT, Melborune, Australia 27 - 30 Jun 2022
Sexism and Project Studies: The Case of Construction and Engineering Organizations
Hajikazemi, S. and Locatelli, G. (2021). Sexism and Project Studies: The Case of Construction and Engineering Organizations. European Academy of Management. Montreal 16 - 18 Jun 2021
Making Tomorrow a More Resilient Place: On Black Swans in The Project-Based Firm
Hajikazemi, S. and Walton, A.J. (2020). Making Tomorrow a More Resilient Place: On Black Swans in The Project-Based Firm. European Academy of Management. Dublin 04 - 06 Dec 2020
Normalising deviance in construction project organizations: a case study on the collapse of Carillion
Hajikazemi, S., Aaltonen, K., Ahola, T., Aarseth, W. and Andersen, B. (2020). Normalising deviance in construction project organizations: a case study on the collapse of Carillion. Construction Management and Economics. https://doi.org/10.1080/01446193.2020.1804069
Normalization of deviance in the construction industry, a managerial perspective
Hajikazemi, S., Ahola, T, Aaltonen, K, Aarseth, W and Andersen, B (2019). Normalization of deviance in the construction industry, a managerial perspective. EURAM 2019: Exploring the future of management. Lisbon, Portugal 26 - 28 Jun 2019
Overcoming barriers against interaction on innovation capabilities within and between smes
Hajikazemi, S., Ekambaram, A, Røstad, CC and Henriksen, B (2018). Overcoming barriers against interaction on innovation capabilities within and between smes. Moon, Ilkyeong, Lee, Gyu M, Park, Jinwoo, Kiritsis, Dimitris and Cieminski, Gregor von (ed.) IFIP WG 5.7 International Conference. Seoul, Korea 26 - 30 Aug 2018 Springer. https://doi.org/10.1007/978-3-319-99704-9_28
Analyzing electrical installation labor productivity through work sampling
Hajikazemi, S., Andersen, B and Langlo, JA (2017). Analyzing electrical installation labor productivity through work sampling. International Journal of Productivity and Performance Management. 66 (4), pp. 539-553. https://doi.org/10.1108/IJPPM-06-2016-0122
Downfall in the Oil Price; Challenges and Opportunities for the Construction Industry
Hajikazemi, S., Olsson, N, Ekambaram, A, Andersen, B and Langlo, JA (2017). Downfall in the Oil Price; Challenges and Opportunities for the Construction Industry. 9th Nordic Conference on Construction Economics and Organization. Goteborg, Sweden 12 - 14 Jun 2017
The Black Swan – Knowing the Unknown in Projects
Hajikazemi, S., Ekambaram, A, Andersen, B and Zidane, YJ-T (2016). The Black Swan – Knowing the Unknown in Projects. Procedia - Social and Behavioral Sciences. 226, pp. 184-192. https://doi.org/10.1016/j.sbspro.2016.06.178
Remedies for Managing Bottlenecks and Time Thieves in Norwegian Construction Projects – Public vs Private Sector
Eik-Andresen, P, Landmark, AD, Hajikazemi, S., Johansen, A and Andersen, B (2016). Remedies for Managing Bottlenecks and Time Thieves in Norwegian Construction Projects – Public vs Private Sector. Procedia - Social and Behavioral Sciences. 226, pp. 343-350. https://doi.org/10.1016/j.sbspro.2016.06.197
Barriers against effective responses to early warning signs in projects
Hajikazemi, S., Andersen, B and Klakegg, OJ (2015). Barriers against effective responses to early warning signs in projects. International Journal of Project Management. 33 (5), pp. 1068-1083. https://doi.org/https://www.doi.org/10.1016/j.ijproman.2015.01.002
The Early Warning Procedure in an International Context
Hajikazemi, S., Andersen, B, Eleftheriadis, R and Capellan, A (2015). The Early Warning Procedure in an International Context. Procedia - Social and Behavioral Sciences. 194, pp. 85-95. https://doi.org/https://www.doi.org/10.1016/j.sbspro.2015.06.122
Detecting Early Warning Signs of Delays in Shipbuilding Projects
Hajikazemi, S., Arica, E, Semini, M, Andersen, B and Alfnes, E (2015). Detecting Early Warning Signs of Delays in Shipbuilding Projects. Advances in production management systems. Tokyo 07 - 09 Sep 2015
Efficiency of project health checks (PHCs) as an early warning system in practice: a case study in Norway telecommunication industry
Hajikazemi, S. and Andersen, B (2014). Efficiency of project health checks (PHCs) as an early warning system in practice: a case study in Norway telecommunication industry. International Journal of Managing Projects in Business. 7 (4), pp. 678-700. https://doi.org/10.1108/IJMPB-01-2014-0012
Identification of Early Warning Signs in Front-End Stage of Projects, an Aid to Effective Decision Making
Hajikazemi, S., Andersen, B and Krane, HP (2013). Identification of Early Warning Signs in Front-End Stage of Projects, an Aid to Effective Decision Making. Procedia - Social and Behavioral Sciences. 74, pp. 212-222. https://doi.org/https://www.doi.org/10.1016/j.sbspro.2013.03.011
Application of performance measurement as an early warning system
Hajikazemi, S. and Andersen, B (2013). Application of performance measurement as an early warning system. International Journal of Managing Projects in Business. 6 (4), pp. 714-738. https://doi.org/https://www.doi.org/10.1108/IJMPB-04-2012-0015
A Review on Possible Approaches for Detecting Early Warning Signs in Projects
Hajikazemi, S., Andersen, B and Krane, HP (2013). A Review on Possible Approaches for Detecting Early Warning Signs in Projects. Project Management Journal. 44 (5), pp. 55-69. https://doi.org/https://www.doi.org/10.1002/pmj.21360
A Conceptual Framework for Application of Performance Measurement as an Early Warning System in Projects, an Analysis on the Case of the London Ambulance Service Project
Hajikazemi, S., Andersen, B and Krane, HP (2012). A Conceptual Framework for Application of Performance Measurement as an Early Warning System in Projects, an Analysis on the Case of the London Ambulance Service Project. PMI® Research and Education Conference. Limerick, Ireland 15 - 18 Jul 2012
Preliminary Investigation of Project Success Criteria in Norway
Hajikazemi, S., Hussein, B and Ramazany, S (2011). Preliminary Investigation of Project Success Criteria in Norway. The 6th IEEE International Conference on Intelligent Data Acquisition and Advanced Computing Systems: Technology and Applications. Prague 15 - 17 Sep 2011