Make, Buy, or Ally? — A Configurational Approach to Governance Choices in Vertical Expansion

Journal article


Lai, Y., Chen, Y., Fu, Y. and Chen, Y. (2023). Make, Buy, or Ally? — A Configurational Approach to Governance Choices in Vertical Expansion. Strategic Change. https://doi.org/10.1002/jsc.2550
AuthorsLai, Y., Chen, Y., Fu, Y. and Chen, Y.
Abstract

Firms expand their vertical boundaries by obtaining ownership of relevant resources. There are three means by which firms can achieve this goal: internal development, mergers and acquisitions (M&A), and equity joint venture. From a transaction cost economics and resource-based view perspective, this study analyzed how resource characteristics, environmental conditions, and firms’ capabilities influence their governance choices. By studying 30 cases involving architectural, engineering, and construction (AEC) firms and employing a fuzzy-set qualitative comparative analysis (fs-QCA) method, the findings of this study reveal that firms did not use configurational approaches when choosing to adopt one strategy over another. Rather, firms avoid to choose certain mean in a configurational approach. All the antecedents jointly influenced firms’ governance choices; however, they did so in a way that led to the firms’ rejection as opposed to implementation of one strategy. The results indicated that firms’ relational capabilities could help them handle external transaction costs and help them identify and exclude strategies with the lowest efficiency. The findings revealed that firms did not choose internal development to avoid high internal transaction costs or expand rapidly into new business. Firms excluded M&A when the similarity between new and existing resources was high to avoid resource redundancy; when market uncertainty was high, they did so to avoid investment risks. Moreover, when high external transaction costs were evident due to interactions and interdependency between firms and their partners, firms tended to choose a more integrated strategy and excluded equity joint venture.

Year2023
JournalStrategic Change
PublisherWiley
ISSN1099-1697
Digital Object Identifier (DOI)https://doi.org/10.1002/jsc.2550
Publication dates
Print02 Aug 2023
Publication process dates
Accepted15 Jul 2023
Deposited04 Aug 2023
Accepted author manuscript
License
File Access Level
Open
Permalink -

https://openresearch.lsbu.ac.uk/item/949w0

Download files

  • 61
    total views
  • 107
    total downloads
  • 2
    views this month
  • 0
    downloads this month

Export as

Related outputs

Infrastructure Model Development to Enhance Resilience against future changes using InfraWorks & GIS
U.A.Khan, Chen, Y., Jin, R., Seidu, D. R. and Hoc Tran Duc (2023). Infrastructure Model Development to Enhance Resilience against future changes using InfraWorks & GIS. The Third International Conference on Sustainable Civil Engineering and Architecture ICSCEA. Da Nang City. Vietnam. 19 - 21 Jul 2023 Springer Nature.
Infrastructure Model Development to Enhance Resilience against future changes using InfraWorks & GIS
U.A.Khan, Chen, Y., Jin, R. and Seidu, R. (2023). Infrastructure Model Development to Enhance Resilience against future changes using InfraWorks & GIS. The Third International Conference on Sustainable Civil Engineering and Architecture ICSCEA. Da Nang City. Vietnam. 19 - 21 Jul 2023
Contract Violations in the Construction Projects: How Contractual Obligations are Reached Affects Contractual and Reputational Enforcement
Yao, H. and Chen, Y. (2023). Contract Violations in the Construction Projects: How Contractual Obligations are Reached Affects Contractual and Reputational Enforcement. IEEE Transactions on Engineering Management. pp. 1-13. https://doi.org/10.1109/TEM.2023.3257883
When does control curb opportunistic behavior: Evidence from the construction industry
Tang, Y., Chen, Y., Yao, H. and Chen, Y. (2023). When does control curb opportunistic behavior: Evidence from the construction industry . Production Planning & Control. https://doi.org/10.1080/09537287.2023.2166882
A Risk Analysis of Construction Projects Delay Factors in the United Kingdom
Ayeni, R., Udeaja, C., Fong, D. and Chen, Y. (2022). A Risk Analysis of Construction Projects Delay Factors in the United Kingdom. International Conference on the Leadership and Management of Projects in the digital age (IC:LAMP 2022). Applied Science University, Bahrain.
The comparations of different image classification models in facility management in the construction industry in the UK
Chen, Y., Fang, Z., Wu, Y., Ebohon, O. and Jin, R. (2022). The comparations of different image classification models in facility management in the construction industry in the UK. 22nd International Conference on Construction Applications of Virtual Reality (CONVR2022). Seoul, South Korean 19 - 19 Nov 2022 CONVR2022.
Construction Infrastructure Project Cost Overrun and Cost Control/Management Techniques.
Seidu, R. D, Allen Maurisha .S., Jin, R., Chen, Y., Young, B. and Ebohon, O. (2022). Construction Infrastructure Project Cost Overrun and Cost Control/Management Techniques. ASOCSA 16th Built Environment International Conference. Lanseria, Johannesburg South Africa. 26 - 27 Sep 2022 ASOCSA.
To be or not to be: why do transaction partners in construction industry avoid formulating agreements into contract documents?
Chen, Y., Wu, Y., Hajikazemi, S., Yao, H. and Ebohon, O. (2022). To be or not to be: why do transaction partners in construction industry avoid formulating agreements into contract documents? CIB WBC 2022. RMIT, Melborune, Australia 27 - 30 Jun 2022
Gaining Competitive Advantage Through Bim: Strategic Positioning Of Bim
Madanayake, U., Ayinla, K. and Chen, Y. (2021). Gaining Competitive Advantage Through Bim: Strategic Positioning Of Bim. Proceedings of Centre for the Integrated Delivery of the Built Environment (IDoBE) on Uncertainties in the Built Environment: How can we build a resilient future in the new normal?. . LSBU, London. UK 21 - 23 Nov 2021
A Systematic Review of Construction Scheduling Methods: Trends, gaps, and potential research areas
Ayeni, R., Udeaja, C., Fong, D. and Chen, Y. (2021). A Systematic Review of Construction Scheduling Methods: Trends, gaps, and potential research areas. IDoBE International Conference, London South Bank University, London. London 22 - 23 Nov 2021 London South Bank University.
Enforcement against contract violation in Chinese construction projects: impacts of trust and perceived intentionality
Chen, Y., Chen, Y., Smyth, H. and Fu, Y. (2021). Enforcement against contract violation in Chinese construction projects: impacts of trust and perceived intentionality. Construction Management and Economics. 39 (8), pp. 687-703. https://doi.org/10.1080/01446193.2021.1950789
Mediating Role of Risk Perception of Trust and Contract Enforcement in the Construction Industry
Yao, H., Chen, Y., Chen, Y. and Zhu, X. (2019). Mediating Role of Risk Perception of Trust and Contract Enforcement in the Construction Industry. Journal of Construction Engineering and Management. 145 (2), pp. 04018130-04018130. https://doi.org/10.1061/(asce)co.1943-7862.0001604
Revisiting the Relationship Between Contract Governance and Contractors’ Opportunistic Behavior in Construction Projects
Wang, Y., Chen, Y., Wang, W., Chen, Y. and Jin, M. (2019). Revisiting the Relationship Between Contract Governance and Contractors’ Opportunistic Behavior in Construction Projects. IEEE Transactions on Engineering Management. https://doi.org/10.1109/tem.2019.2945551
Influence of Prior Ties on Trust in Contract Enforcement in the Construction Industry: Moderating Role of the Shadow of the Future
Chen, Y., Yongqiang Chen, Zhaojun Liu and Hongjiang Yao (2018). Influence of Prior Ties on Trust in Contract Enforcement in the Construction Industry: Moderating Role of the Shadow of the Future. Journal of Management in Engineering. 34 (2), pp. 04017064-04017064. https://doi.org/10.1061/(asce)me.1943-5479.0000584